Project Description
During this project, the client has requested to design the pipe system for the installation of a reactor vessel.
The aim of the reactor installation is to reduce the NOx particles exposed to the atmosphere during the production of fertilizers in the chemical plant.
The calculation is based on the Eurocode rules and standards.